TRICO Logo

We’d love to hear from you

360-757-2373

"*" indicates required fields

Which service are you inquiring?*

City of Mount Vernon Public Works Maintenance Shop Canopy Enclosure and Dry Flood Proofing

This project converted an existing 40' x 60' clear-span steel truss Maintenance Shop into an enclosed, more functional facility for the City of Mount Vernon. The work included PEMB additions to enclose the structure, installation of CMU/Framing infill of three walls for flood-proof foundation, and two flood-proof garage door openings. To improve stability during high water events, micropiles were installed to help anchor the building. Together, these enhancements help safeguard City assets, reduce flood-related impacts, and provide Public Works staff with a dependable facility that offers better protection from the elements and a more practical space to support daily operations.

Project Specifications

Location: Mount Vernon, WA
Square Footage: 2,400
Delivery: Bid-Build