Samish River Emergency Dike Repair & Restoration
Emergency repair of a 20-foot breach in the dike along the Samish River near Edison. Large-scale excavation and stabilization effort using steel sheets, sand-filled bags, fine rock, and plastic covering to stop flooding and prevent erosion. Construction schedule dictated by permit conditions for sensitive areas. Collaborative effort with local authorities, emergency teams, Washington Department of Fish and Wildlife, and community members.
Project Specifications
Location: Edison, WA
Square Footage: N/A
Delivery: T&M

