TRICO Logo

We’d love to hear from you

360-757-2373

"*" indicates required fields

Which service are you inquiring?*

Skagit Fields

Pasture with wetlands transformed into soccer fields. The project included clearing, grading, soil preparation, erosion control, excavation of a 2,800 LCY stormwater pond, drainage swales, and piping. A wood chip path was added, with plans for future picnic tables to create walkways and seating.

Project Specifications

Location: Mount Vernon, WA
Square Footage: 11 acres
Delivery: Bid-Build