COMMERCIAL / MEDICAL / PROFESSIONAL OFFICE BUILDINGS

A Painless Procedure for Hilde Family Dentistry

Like a good root canal, getting down to solid foundational material is key to the start of a healthy, stable future. TRICO’s Civil team is prepping the ground for the future home of Hilde Family Dentistry. In the coming weeks, we will see the TRICO Team dig underground utilities, pour concrete slab and then start wood framing. View Project
Featured Post

TRICO Completes Entryway for Car Care Clinic

Working with the Owner through a design-build process, TRICO Team designed and built an exposed timber entryway for the Car Care Clinic in Mount Vernon. This new entryway invites customers to the front door and complements the interior finishes.
Featured Post

TRICO Tenant Improvement for PeaceHealth Fairhaven Plaza Clinic Underway

TRICO is working with PeaceHealth on a tenant improvement in Bellingham converting a portion of an existing building into a new Primary Care Same Day / Walk-In Care Clinic. HVAC systems have been updated to accommodate the new use with ducting complete. Interior wall framing in process followed by electrical and plumbing rough in then walls and drop in ceilings. The entire space will receive final face lift with floors, millwork, paint, plumbing fixtures, and lighting package.
Featured Post

What’s Happening at Skagit Imaging Pavilion

Exterior siding has been installed. Interior finishes are well underway including paint, drop ceilings, cabinetry, and flooring. Mechanical, electrical and plumbing trades will follow to set final trim. In a couple weeks, Siemens Healthcare will be on site to place the Magnetic Resonance Imaging (MRI) and computed tomography (CT) units.
Featured Post

TRICO Completes Sleep Study Department Relocation at PeaceHealth United General Medical Center

TRICO completes relocation of sleep monitoring tech office and multiple sleep procedure rooms at PeaceHealth United General Medical Center. Renovations include new hallway door, separation wall, infrastructure for sleep monitoring equipment, and access control devices. Also included are updated floors, mill work, lighting fixtures, plumbing fixtures, and fire sprinklers. Renovations were performed to provide staff and patients with updated facilities increasing security by providing an access controlled new space for afterhours care.
Featured Post

Checking in on Skagit Imaging Pavilion

Building wrap, interior framing and rough-in are complete. Installation of windows and doors underway. Next up, exterior stone veneer and metal siding and interior insulation and drywall.View Project
Read More

TRICO Renovates Mammography Suite at PeaceHealth United General Medical Center

TRICO renovates mammography suite at PeaceHealth United General Medical Center. Renovations include updated floors, paint, electrical, doors, light fixtures, fire sprinklers, and expanded the procedure room for newly acquired mammography equipment. All updates were done to maximize the usability and comfort of the space for staff and patients.
Read More

TRICO Building Foundations in the Community

TRICO pours foundation for the new 8,200 sf Skagit Imaging Pavilion. Crew members are wearing pink high visibility apparel in awareness of women’s health and the Breast Care Center that will be occupying a portion of the new building. View Project
Read More

Checking in at Skagit Imaging Pavilion

Under the blanket of snow, ground has been broken at the Skagit Imaging Pavilion project site. Our civil crew awaits a break in the weather to finish up building footing excavation and utility trenching. Next our carpenters will begin forming concrete footings. View project
Read More