When Calbee North America decided to double the size of their facility, they called TRICO. This project required detailed coordination with the equipment engineering team working parallel with the TRICO design-build project delivery team to realize a successful project. Utilizing TRICO’s unique capabilities, Calbee North America’s facility was able to remain in full production throughout the construction process.
Project Specifications:
- Square Feet — 50,000
- Project Delivery — Design-Build
- Description — New Potato Processing, Packaging and Storage
- Location — Boardman, OR